☀️SolarLedger
Utah (UT) • Rocky Mountain Power (PacifiCorp)Model: Avoided Cost

Rocky Mountain Power (Utah) Schedule 137 Export Credit Rate Analysis

Utah’s Rocky Mountain Power closed Schedule 135 (1:1) and Schedule 136, moving all new solar customers onto Schedule 137 where exported solar earns only 4.7¢–5.9¢/kWh while tiered retail imports reach 14.5¢/kWh.

Peak Import Rate
$0.12 – $0.15 / kWh (Tiered Residential Schedule 1)
Midday Export Credit
$0.056 – $0.059 / kWh (Summer) / $0.047 / kWh (Winter Schedule 137)
Peak Export / VPP Bonus
$0.059 / kWh (Flat Seasonal Export Credit)
Min Monthly Bill
$10.00 Customer Service Charge

1. 24-Hour Import Cost vs. Export Credit Visualizer

Schedule: Utah Schedule 137 (Net Billing Service — Post-Schedule 136)

Compare what Rocky Mountain Power (PacifiCorp) charges you to import 1 kWh vs. what they pay you when you export 1 kWh during each time window—and how your battery inverter should be programmed:

8:00 AM – 4:00 PM (Utah High-Altitude Solar Peak)
Import: 13.5¢/kWhExport: 5.8¢/kWh
Grid Buy:
Grid Sell:
Inverter Dispatch Rule: Self-consume daytime power and store surplus in LFP battery to avoid losing 7.7¢/kWh on exports
4:00 PM – 11:00 PM (Evening Household Load)
Import: 14.2¢/kWhExport: 5.8¢/kWh
Grid Buy:
Grid Sell:
Inverter Dispatch Rule: Discharge LFP battery to prevent crossing into expensive Tier 2/Tier 3 RMP consumption blocks
Wattsmart Battery Grid Dispatch Events
Import: 11¢/kWhExport: 5.8¢/kWh
Grid Buy:
Grid Sell:
Inverter Dispatch Rule: Collect Rocky Mountain Power Wattsmart upfront cash rebate + annual bill credits

2. Forensic Tariff & Battery Arbitrage Math

Battery Pairing Necessity Score: 85% Recommended (Exports earn <50% of retail Tier 2/3 import rate + Wattsmart Battery Rebate)
  • 1Schedule 137 Export Haircut: Exporting 1 kWh to Rocky Mountain Power at 1:00 PM earns 5.84¢ (Summer) or 4.69¢ (Winter), while buying 1 kWh back at 7:00 PM in Tier 2/3 costs ~13.8¢ to 14.8¢—a 60% haircut on every exported kWh.
  • 2Rocky Mountain Power Wattsmart Battery Incentive: RMP pays Utah homeowners an upfront cash rebate of $400 to $600 per kW of enrolled battery storage (up to $3,000+) plus ongoing annual incentives for enrolling UL9540 batteries in the Wattsmart grid program.
Optimal Hardware Architecture for Rocky Mountain Power (PacifiCorp)

EG4 18kPV + 14.3kWh PowerPro or EcoFlow Delta Pro Ultra

Estimated Payback under Utah Schedule 137 (Net Billing Service — Post-Schedule 136): 6.4 – 7.5 Years

View Direct Wholesale Pricing →

Rocky Mountain Power (PacifiCorp) Solar Tariff FAQ

Do my Schedule 137 export credits expire each year in Utah?

Yes. Unused Schedule 137 export credits roll over monthly from April through March and expire at the end of the March billing period (transferred to RMP’s low-income assistance fund).

Should I oversize my solar panels in Utah without a battery?

No. Because exports only earn ~5.3¢/kWh average, oversizing solar without a battery has a 14+ year payback on the exported portion. Size the panels for daytime loads and add a 14.3 kWh LFP battery to capture evening usage.

More Utility NEM 3.0 & Avoided Cost Rate Matrices