☀️SolarLedger
⚡ 40 Major US Investor-Owned & Municipal Utilities Audited

2026 Electric Utility Net Metering, TOU Rates & Battery ROI Directory

Your electric utility—not your solar installer—dictates how much every kilowatt-hour your roof generates is actually worth. Inspect our forensic teardowns of 40 major US utilities below.

🛡️ Audit a Solar Proposal →🏙️ 12-Metro Utility Rate Grid
Electric Utility2026 Tariff ClassificationOn-Peak RateBattery PaybackTeardown
Duke Energy Carolinas
North Carolina & South Carolina
Solar Choice TOU Bridge / Net Billing$0.19 – $0.24 / kWh (Critical Peak)⚡ 4.8 Years (with $9,000 Duke PowerPair Rebate)Read Tariff Audit →
Duke Energy Progress
Eastern NC, Raleigh, Asheville & SC
Solar Choice TOU Bridge / Net Billing$0.19 – $0.25 / kWh (On-Peak)⚡ 4.7 Years (with Duke PowerPair Incentive)Read Tariff Audit →
Duke Energy Florida
Central Florida, St. Petersburg, Clearwater, Orlando Suburbs
1:1 Retail Net Metering (with $30/mo Minimum Bill)$0.17 – $0.19 / kWh⚡ 5.9 YearsRead Tariff Audit →
Dominion Energy Virginia
Northern Virginia, Richmond, Hampton Roads
1:1 Retail Net Metering (Virginia Clean Economy Act)$0.16 – $0.19 / kWh⚡ 5.8 Years (with VA SREC Income)Read Tariff Audit →
National Grid (Upstate New York)
Buffalo, Syracuse, Albany, Capital Region, Utica
NY VDER Phase One Net Metering (1:1 + CBC)$0.23 – $0.27 / kWh⚡ 5.6 Years (after NY-Sun + $5,000 NY State Tax Credit)Read Tariff Audit →
National Grid Massachusetts
Worcester, Lowell, North Shore, Fall River, Nantucket
MA 1:1 Net Metering (≤10 kW AC) + ConnectedSolutions$0.33 – $0.37 / kWh⚡ 4.4 Years (with $275/kW/yr ConnectedSolutions Payouts)Read Tariff Audit →
Xcel Energy Colorado
Denver Metro, Boulder, Aurora, Lakewood, Grand Junction
1:1 Retail Net Metering with Residential TOU$0.27 – $0.31 / kWh (3pm–7pm Summer Peak)⚡ 5.7 Years (with Xcel Battery Connect Incentives)Read Tariff Audit →
Xcel Energy Minnesota
Minneapolis, St. Paul, Twin Cities Metro
1:1 Average Retail Utility Energy Rate Net Metering$0.19 – $0.23 / kWh (Summer Peak)⚡ 6.2 Years (with Solar*Rewards PBI)Read Tariff Audit →
Georgia Power
Atlanta Metro, Savannah, Augusta, Macon, Columbus
RNR Instantaneous Netting (Avoided Cost Export)$0.23 – $0.31 / kWh (Summer TOU Peak 2pm–7pm)⚡ 5.4 Years (Direct Solar + Battery) vs 12.8 Yrs Solar-OnlyRead Tariff Audit →
Southern California Edison (SCE)
Los Angeles Suburbs, Orange County, Inland Empire, Ventura
CPUC NEM 3.0 Net Billing (TOU-D-PRIME)$0.54 – $0.64 / kWh (4pm–9pm Peak)⚡ 4.6 Years (Direct Battery) vs 13.8 Yrs Solar-OnlyRead Tariff Audit →
Pacific Gas & Electric (PG&E)
San Francisco Bay Area, San Jose, Oakland, Fresno, Central Valley
CPUC NEM 3.0 Net Billing (E-ELEC Schedule)$0.58 – $0.68 / kWh (4pm–9pm Peak)⚡ 4.3 Years (Direct Battery) vs 13.9 Yrs Solar-OnlyRead Tariff Audit →
San Diego Gas & Electric (SDG&E)
San Diego County & Southern Orange County
CPUC NEM 3.0 Net Billing (EV-TOU-5 / TOU-DR1)$0.65 – $0.82 / kWh (4pm–9pm Summer Peak)⚡ 4.1 Years (Fastest in the US with Direct Battery)Read Tariff Audit →
LADWP (Los Angeles Dept. of Water & Power)
City of Los Angeles & San Fernando Valley
Municipal 1:1 Net Energy Metering (NEM)$0.29 – $0.38 / kWh (R-1B TOU High Peak)⚡ 5.1 YearsRead Tariff Audit →
SMUD (Sacramento Municipal Utility District)
Sacramento County & Portions of Placer County
SMUD Solar & Storage Rate ($0.074/kWh Export)$0.35 – $0.37 / kWh (5pm–8pm Summer TOD Peak)⚡ 5.3 Years (with SMUD VPP Rebate)Read Tariff Audit →
Salt River Project (SRP)
East Valley Phoenix, Mesa, Chandler, Gilbert, Tempe
SRP E-27 Customer Generation (Demand Charge) / E-13 Export$0.21 – $0.26 / kWh + $9.59–$34.19/kW Demand Charge⚡ 4.9 Years (with Automated Demand Peak Shaving)Read Tariff Audit →
Arizona Public Service (APS)
Phoenix, Scottsdale, West Valley, Prescott, Flagstaff, Yuma
Resource Comparison Proxy (RCP) Net Billing$0.34 – $0.36 / kWh (4pm–7pm Summer Peak)⚡ 5.1 Years (Direct Battery) vs 9.6 Yrs Solar-OnlyRead Tariff Audit →
Entergy (Texas, Louisiana, Arkansas, Mississippi)
The Woodlands, Conroe, Beaumont (TX) & New Orleans / Baton Rouge (LA)
Avoided Cost Net Billing (~$0.04–$0.055/kWh Export)$0.15 – $0.18 / kWh⚡ 5.8 YearsRead Tariff Audit →
DTE Energy
Detroit Metro, Wayne, Oakland, Macomb & Washtenaw Counties
MPSC Inflow / Outflow Distributed Generation Tariff$0.23 – $0.27 / kWh (3pm–7pm Weekday Peak)⚡ 5.6 YearsRead Tariff Audit →
Consumers Energy
Grand Rapids, Flint, Lansing Suburbs, Kalamazoo, Traverse City
MPSC Inflow / Outflow Distributed Generation Tariff$0.24 – $0.28 / kWh (2pm–7pm Summer Peak)⚡ 5.7 YearsRead Tariff Audit →
Ameren (Illinois & Missouri)
Downstate Illinois (Metro East, Peoria, Champaign) & St. Louis, MO
Supply Net Metering + Illinois Shines Upfront SRECs (IL)$0.18 – $0.22 / kWh⚡ 4.2 Years (Illinois CEJA Rebates + SRECs)Read Tariff Audit →
Evergy (Kansas & Kansas City Metro)
Kansas City Metro, Wichita, Topeka, Overland Park, Olathe
1:1 Net Metering with TOU (Parallel Generation)$0.21 – $0.28 / kWh (4pm–8pm Summer Peak)⚡ 6.1 YearsRead Tariff Audit →
PPL Electric Utilities
Allentown, Bethlehem, Harrisburg, Lancaster, Scranton, Wilkes-Barre
PA 1:1 Full Retail Net Metering + Annual Price-to-Compare Cashout$0.19 – $0.22 / kWh⚡ 5.9 YearsRead Tariff Audit →
PECO Energy (Exelon)
Philadelphia, Montgomery, Bucks, Chester & Delaware Counties
PA 1:1 Full Retail Net Metering + Solar Rebate$0.20 – $0.24 / kWh⚡ 5.7 YearsRead Tariff Audit →
BGE (Baltimore Gas & Electric)
Baltimore City, Baltimore County, Anne Arundel, Howard, Harford
Maryland 1:1 Full Retail Net Metering + MD SRECs$0.20 – $0.24 / kWh⚡ 5.1 Years (with 30% MD Storage Credit + SRECs)Read Tariff Audit →
Pepco (Potomac Electric Power Company)
Montgomery County, Prince George's County (MD) & Washington, D.C.
1:1 Full Retail Net Metering + MD / DC SRECs$0.21 – $0.25 / kWh⚡ 4.5 Years (MD) / 3.2 Years (DC SREC Market)Read Tariff Audit →
Eversource Energy (MA, CT, NH)
Boston, Eastern/Western MA, Hartford & Stamford (CT), Manchester (NH)
MA 1:1 Net Metering (≤10kW AC) / CT RRES Tariff + ConnectedSolutions$0.32 – $0.37 / kWh⚡ 4.3 Years (Highest New England ROI)Read Tariff Audit →
Rocky Mountain Power
Salt Lake City, Provo, Ogden, St. George, Park City (Utah)
Schedule 137 Net Billing ($0.056–$0.068/kWh Export)$0.14 – $0.18 / kWh (Summer Tiered / TOU)⚡ 5.8 Years (with Wattsmart Upfront Battery Rebate)Read Tariff Audit →
NV Energy
Las Vegas, Henderson, North Las Vegas, Reno, Sparks, Carson City
NMR-405 Tier 4 Net Metering (75% Retail Credit)$0.38 – $0.46 / kWh (Summer TOU Peak)⚡ 5.2 YearsRead Tariff Audit →
Idaho Power
Boise, Meridian, Nampa, Caldwell, Twin Falls, Pocatello
Export Credit Rate (ECR) Real-Time Net Billing$0.13 – $0.17 / kWh (Summer Peak)⚡ 6.4 YearsRead Tariff Audit →
Consolidated Edison (Con Edison)
New York City (5 Boroughs) & Westchester County
NY VDER Phase One 1:1 Net Metering + CBC$0.36 – $0.48 / kWh (Summer Supply + Delivery)⚡ 4.7 Years (after NY-Sun + $5,000 NY Tax Credit)Read Tariff Audit →
PSEG Long Island
Nassau County, Suffolk County & The Hamptons
1:1 Retail TOU Net Metering + CBC$0.28 – $0.39 / kWh (Rate 194 3pm–7pm Peak)⚡ 4.8 YearsRead Tariff Audit →
PSE&G (Public Service Electric & Gas — NJ)
Newark, Jersey City, Bergen, Essex, Hudson, Middlesex, Mercer, Camden
NJ 1:1 Full Retail Net Metering + SREC-II ($85/MWh)$0.23 – $0.27 / kWh⚡ 4.9 Years (with $85/MWh NJ SREC-II Income)Read Tariff Audit →
Florida Power & Light (FPL)
Miami, Fort Lauderdale, West Palm Beach, Sarasota, Fort Myers, Pensacola
Florida Tier 1 1:1 Full Retail Net Metering (≤10 kW AC)$0.15 – $0.18 / kWh⚡ 5.5 YearsRead Tariff Audit →
Tampa Electric (TECO)
Tampa, Hillsborough County, Brandon, Plant City, Winter Haven
Florida 1:1 Full Retail Net Metering$0.16 – $0.19 / kWh⚡ 5.6 YearsRead Tariff Audit →
Oncor Electric Delivery
Dallas, Fort Worth, Arlington, Plano, Frisco, Waco, Midland, Odessa
Deregulated REP Solar Buyback + Oncor Solar Rebate$0.17 – $0.24 / kWh (Delivered REP + $0.0559/kWh TDU)⚡ 4.8 Years (with Oncor Solar + Battery Rebate)Read Tariff Audit →
CenterPoint Energy
Houston Metro, Sugar Land, Katy, Pearland, Pasadena, Galveston
Deregulated REP Solar Buyback (ERCOT Houston Zone)$0.17 – $0.23 / kWh (Delivered REP + $0.052/kWh TDU)⚡ 5.1 Years + Multi-Day Hurricane Beryl-Grade BackupRead Tariff Audit →
Austin Energy
City of Austin & Travis County Service Territory
Value of Solar Tariff (VOST — $0.0991/kWh)$0.14 – $0.21 / kWh (4-Tier Inclining Block Rate)⚡ 5.2 Years (with $2,500 Austin Energy Rebate)Read Tariff Audit →
CPS Energy
San Antonio & Bexar County
1:1 Net Metering with Monthly Excess @ Avoided Cost$0.14 – $0.17 / kWh (Summer Peak Demand)⚡ 5.8 YearsRead Tariff Audit →
ComEd (Commonwealth Edison)
Chicago, Cook County, DuPage, Lake, Will, Kane & Northern Illinois
Supply 1:1 Net Metering + Illinois Shines Upfront SRECs$0.17 – $0.21 / kWh⚡ 3.9 Years (Illinois Shines SREC Check + ComEd Rebates)Read Tariff Audit →
FirstEnergy (Ohio Edison, Illuminating Co, Met-Ed, Penelec, JCP&L)
Cleveland, Akron, Toledo (OH), Reading/Erie (PA), Monmouth/Ocean (NJ)
1:1 Retail Net Metering (PA/NJ/MD) | Generation Supply Netting (OH)$0.18 – $0.24 / kWh⚡ 5.3 Years (NJ/PA/MD) / 6.1 Years (OH)Read Tariff Audit →
⚡ Direct Wholesale Hardware · Save $8,000–$14,000

Utility-Compliant UL 9540 Home Battery & Hybrid Inverter Systems

Turnkey solar salespeople routinely charge $3.60–$4.80/W by bundling 30% loan dealer fees and $12,000+ battery margins. Buying Tier-1 UL9540 hardware directly—either DIY or hiring a local licensed electrician ($1,500–$2,500)—cuts total cost by 50–65%.

Compare All 5 Home Batteries (2026 Matrix) →Get a Free 2nd Opinion on Your Quote →
Best Pro/DIY Value vs. NEM 3.0 & MarkupsSignature Solar / EG4

EG4 18kPV Inverter + 14.3kWh PowerPro WallMount

DIRECT HARDWARE COST~$8,200 – $9,500 (Hardware)
EST. PAYBACK4.2 – 5.5 yrs

The gold-standard UL9540 all-in-one hybrid system. Pair an 18kW PV input hybrid inverter (200A pass-through) with an indoor/outdoor IP65 14.3kWh LiFePO4 WallMount battery—saving $12,000+ vs turnkey quotes.

  • 18kW PV Input / 12kW Continuous AC Output (200A Pass-Through)
  • 14.3kWh LiFePO4 (8,000+ cycles @ 80% DoD)
  • UL9540 & UL1741-SB Certified for Permit Approval
Best for: Whole-home 200A hybrid solar, NEM 3.0 TOU arbitrage & blackout defense
Check Price at Signature Solar →
Best Plug & Play Whole-Home BackupEcoFlow Official

EcoFlow Delta Pro Ultra (6kWh–30kWh Modular)

DIRECT HARDWARE COST~$4,999 – $5,799
EST. PAYBACK4.5 – 6.0 yrs

Skip the $30,000 contractor quote and 6-month utility interconnection wait. Delivers 7.2kW–21.6kW continuous 120V/240V split-phase output and 5.6kW Solar Input right out of the box—expandable up to 90kWh.

  • 7,200W–21,600W 120V/240V Split-Phase Output
  • 6.1kWh LFP Stackable Battery (scales to 30kWh–90kWh)
  • 5,600W Solar Input — Zero Roof Permit Required for Portable PV
Best for: Zero-contractor setup, peak-rate shaving, and instant blackout protection
Check Price at EcoFlow Official →
Best Budget Off-Grid & Hybrid KitRenogy Solar

Renogy 48V Off-Grid & Hybrid LFP Solar Kit

DIRECT HARDWARE COST~$3,200 – $4,800
EST. PAYBACK3.5 – 4.8 yrs

Complete modular 48V architecture combining high-efficiency N-type bifacial panels, a 48V 3,500W–5,000W MPPT inverter-charger, and smart modular LiFePO4 storage at ~$1.15/W hardware cost.

  • 48V High-Efficiency Bus (75% lower copper wire loss)
  • Modular 48V 50Ah / 100Ah Smart LiFePO4 Battery Bank
  • Complete Plug-and-Play MPPT All-in-One Controller
Best for: Cabins, workshops, garages, critical-load subpanels & budget DIYers
Explore Renogy 48V Kits →
Prefer a turnkey local installer without door-to-door sales reps? Compare online cash quotes from pre-vetted local contractors or use our Second-Opinion Quote Triage.
Compare Vetted Local Quotes (EnergySage) →

Auditor Disclosure: Solar Ledger never sells your contact information to solar telemarketers. Outbound partner links (/go/...) may earn a referral commission at zero additional cost to you.