☀️SolarLedger
⚡ 2026 Utility Tariff & Battery Arbitrage Index · 12 Major US Metros

The Metro Money Grid: 2026 Utility Rate & Solar Payback Teardowns

Statewide solar averages hide the utility-specific rules that actually determine whether your system pays for itself in 4 years or loses money for 15. Below is our forensic breakdown of the 12 most critical US metropolitan utility territories—comparing 2026 peak $/kWh tariffs, export credit traps (NEM 3.0, TDU fees, demand charges), and side-by-side battery ROI.

🛡️ Audit a Local Installer Quote →🚨 Unmask Hidden 30% Loan Dealer Fees🔋 Compare Direct Home Batteries ($/kWh)
Sort Metros By
State:
Metro Area & UtilityPeak Rate (2026)Net Metering PolicyDirect Battery PaybackAction
San Diego Gas & Electric (SDG&E)
$0.65 – $0.82 / kWh
Off-Peak: $0.16 – $0.38 / kWh (Super Off-Peak 12am–6am)
NEM 3.0 Net Billing (Battery Mandatory)
⚡ 4.1 yrs
Solar-Only: 14.2 yrs
Analyze Rates →
Pacific Gas & Electric (PG&E)
$0.58 – $0.66 / kWh
Off-Peak: $0.39 – $0.43 / kWh (Midnight–3pm)
NEM 3.0 Net Billing (Battery Mandatory)
⚡ 4.5 yrs
Solar-Only: 16.5 yrs
Analyze Rates →
Southern California Edison (SCE)
$0.54 – $0.63 / kWh
Off-Peak: $0.24 – $0.27 / kWh (8am–4pm & 9pm–8am)
NEM 3.0 Net Billing (Battery Mandatory)
⚡ 4.4 yrs
Solar-Only: 15.8 yrs
Analyze Rates →
Consolidated Edison (Con Edison)
$0.34 – $0.44 / kWh
Off-Peak: $0.14 – $0.21 / kWh (Overnight TOU Off-Peak)
1:1 Net Metering + 25% NY Tax Credit
⚡ 4.8 yrs
Solar-Only: 6.4 yrs
Analyze Rates →
PSEG Long Island
$0.31 – $0.39 / kWh
Off-Peak: $0.15 – $0.18 / kWh (Super Off-Peak 10pm–6am)
1:1 TOD Bucket Net Metering + $5k NY Credit
⚡ 4.9 yrs
Solar-Only: 7.2 yrs
Analyze Rates →
Arizona Public Service (APS) & Salt River Project (SRP)
$0.21 – $0.34 / kWh (+ Demand Charges)
Off-Peak: $0.09 – $0.12 / kWh (APS Super Off-Peak Winter 10am–3pm: ~$0.035/kWh)
Net Billing + Demand Charges (Battery Essential)
⚡ 4.3 yrs
Solar-Only: 11.8 yrs
Analyze Rates →
NV Energy (Southern Nevada)
$0.15 – $0.43 / kWh (Standard vs Optional TOU)
Off-Peak: $0.095 / kWh (Optional TOU Off-Peak)
75% Retail Net Metering Floor (20-Yr Lock)
⚡ 4.7 yrs
Solar-Only: 8.8 yrs
Analyze Rates →
CenterPoint Energy (ERCOT Deregulated REPs)
$0.17 – $0.29 / kWh
Off-Peak: $0.00 / kWh (Free Nights 9pm–7am) or ~$0.145/kWh
Deregulated Buyback + Hurricane Backup
⚡ 4.5 yrs
Solar-Only: 13.8 yrs
Analyze Rates →
Oncor Electric Delivery (ERCOT Deregulated REPs)
$0.16 – $0.28 / kWh
Off-Peak: $0.00 / kWh (9pm–7am on Free Nights Plans) or ~$0.14/kWh
Deregulated Buyback / Free Nights Arbitrage
⚡ 4.6 yrs
Solar-Only: 13.4 yrs
Analyze Rates →
Commonwealth Edison (ComEd)
$0.165 – $0.21 / kWh
Off-Peak: $0.09 – $0.14 / kWh (ComEd Hourly Pricing)
Upfront Illinois Shines SRECs ($9k–$12k Cash) + $300/kW Rebate
⚡ 3.9 yrs
Solar-Only: 5.8 yrs
Analyze Rates →
Austin Energy (Municipal Utility)
$0.14 – $0.21 / kWh (4-Tier Progressive Rate)
Off-Peak: $0.09 – $0.11 / kWh (Tier 1 Base)
Value of Solar Tariff ($0.0991/kWh) + $2,500 Rebate
⚡ 5.2 yrs
Solar-Only: 10.6 yrs
Analyze Rates →
Florida Power & Light (FPL)
$0.145 – $0.175 / kWh (Over 1,000 kWh Tier)
Off-Peak: $0.135 / kWh (Flat 1:1 Retail Net Metering)
1:1 Retail Net Metering (10 kW AC Tier 1 Cap)
⚡ 5.4 yrs
Solar-Only: 8.2 yrs
Analyze Rates →

All 12 Dedicated Metropolitan Utility Teardowns

Select your metropolitan utility zone below to view exact 2026 Time-of-Use windows, monthly fixed charges, local rebate stacking, and 3-way payback math.

California · CAPeak: $0.65 – $0.82 / kWh

San Diego Metro: San Diego Gas & Electric (SDG&E)

Cities: San Diego, Chula Vista, Oceanside, Carlsbad, Escondido, El Cajon

San Diego Gas & Electric (SDG&E) charges the highest electricity rates in continental US ($0.65–$0.82/kWh peak). See why solar + a 14.3kWh battery cuts NEM 3.0 payback from 14 years to 4.1–5.2 years.

Export Rule:NEM 3.0 Net Billing (Battery Mandatory)
Direct ESS Payback:4.1 yrs
California · CAPeak: $0.58 – $0.66 / kWh

San Francisco Bay Area: Pacific Gas & Electric (PG&E)

Cities: San Francisco, San Jose, Oakland, Fremont, Santa Rosa, Walnut Creek, Palo Alto

Forensic payback math for San Francisco, San Jose, and Oakland homeowners on PG&E E-ELEC: beat $0.64/kWh peak rates, wildfire PSPS blackouts, and $40,000 contractor quotes.

Export Rule:NEM 3.0 Net Billing (Battery Mandatory)
Direct ESS Payback:4.5 yrs
California · CAPeak: $0.54 – $0.63 / kWh

Los Angeles & Orange County: Southern California Edison (SCE)

Cities: Irvine, Anaheim, Santa Ana, Long Beach, Santa Clarita, Torrance, Riverside, San Bernardino

Southern California Edison (SCE) NEM 3.0 solar and battery payback guide for LA, Orange County, and Inland Empire homeowners: TOU-D-PRIME math and direct battery savings.

Export Rule:NEM 3.0 Net Billing (Battery Mandatory)
Direct ESS Payback:4.4 yrs
New York · NYPeak: $0.34 – $0.44 / kWh

New York City & Westchester: Consolidated Edison (Con Edison)

Cities: Queens, Brooklyn, Staten Island, Bronx, Manhattan, Yonkers, White Plains, New Rochelle

Con Edison solar payback breakdown for NYC (Queens, Brooklyn, Staten Island, Bronx) and Westchester: stack the $5,000 NY State Tax Credit, 30% NYC Property Tax Abatement, and 1:1 net metering.

Export Rule:1:1 Net Metering + 25% NY Tax Credit
Direct ESS Payback:4.8 yrs
New York · NYPeak: $0.31 – $0.39 / kWh

Long Island (Nassau & Suffolk): PSEG Long Island

Cities: Hempstead, Oyster Bay, Huntington, Brookhaven, Islip, Babylon, Smithtown, Southampton

PSEG Long Island solar and home battery audit for Nassau and Suffolk County homeowners: Rate 194 Time-of-Day bucket net metering, $5,000 NY State tax credit, and coastal backup.

Export Rule:1:1 TOD Bucket Net Metering + $5k NY Credit
Direct ESS Payback:4.9 yrs
Arizona · AZPeak: $0.21 – $0.34 / kWh (+ Demand Charges)

Phoenix & Scottsdale Metro: Arizona Public Service (APS) & Salt River Project (SRP)

Cities: Phoenix, Scottsdale, Mesa, Chandler, Gilbert, Glendale, Tempe, Peoria, Surprise

Phoenix, Scottsdale, Mesa, and Chandler solar payback guide for APS and SRP utilities: beat 4pm–7pm summer AC demand charges, low RCP export rates, and $35,000 solar loan traps.

Export Rule:Net Billing + Demand Charges (Battery Essential)
Direct ESS Payback:4.3 yrs
Texas · TXPeak: $0.16 – $0.28 / kWh

Dallas–Fort Worth Metroplex: Oncor Electric Delivery (ERCOT Deregulated REPs)

Cities: Dallas, Fort Worth, Plano, Arlington, Frisco, McKinney, Irving, Denton, Garland

DFW (Dallas, Fort Worth, Plano, Frisco) solar payback guide for Oncor territory: why '1:1' Texas buyback plans lose 5.1¢/kWh in Oncor TDU fees and how Free Nights + a 14.3kWh battery wins.

Export Rule:Deregulated Buyback / Free Nights Arbitrage
Direct ESS Payback:4.6 yrs
Texas · TXPeak: $0.17 – $0.29 / kWh

Houston Metro: CenterPoint Energy (ERCOT Deregulated REPs)

Cities: Houston, Sugar Land, The Woodlands, Katy, Pearland, League City, Pasadena, Conroe

Houston, Katy, Sugar Land, and The Woodlands solar & battery guide for CenterPoint territory: beat 5.4¢/kWh TDU fees and keep central AC running during multi-day Gulf hurricane blackouts.

Export Rule:Deregulated Buyback + Hurricane Backup
Direct ESS Payback:4.5 yrs
Texas · TXPeak: $0.14 – $0.21 / kWh (4-Tier Progressive Rate)

Austin Metro: Austin Energy (Municipal Utility)

Cities: Austin, Round Rock, Cedar Park, Pflugerville, Georgetown, Kyle, San Marcos (Pedernales / Bluebonnet)

Complete Austin Energy Value of Solar Tariff (VOST) payback analysis: understand how the $0.0991/kWh gross generation credit works, claim the $2,500 rebate, and prevent Tier 3–4 bill spikes.

Export Rule:Value of Solar Tariff ($0.0991/kWh) + $2,500 Rebate
Direct ESS Payback:5.2 yrs
Florida · FLPeak: $0.145 – $0.175 / kWh (Over 1,000 kWh Tier)

Miami, Fort Lauderdale, West Palm & Sarasota: Florida Power & Light (FPL)

Cities: Miami, Fort Lauderdale, West Palm Beach, Boca Raton, Naples, Fort Myers, Sarasota, Daytona Beach

Florida Power & Light (FPL) solar and hurricane battery audit for Miami, Fort Lauderdale, West Palm Beach, and Southwest FL: 1:1 net metering, the $25 minimum bill, and the 10 kW AC Tier 2 insurance trap.

Export Rule:1:1 Retail Net Metering (10 kW AC Tier 1 Cap)
Direct ESS Payback:5.4 yrs
Nevada · NVPeak: $0.15 – $0.43 / kWh (Standard vs Optional TOU)

Las Vegas & Henderson Metro: NV Energy (Southern Nevada)

Cities: Las Vegas, Henderson, Summerlin, North Las Vegas, Boulder City, Enterprise, Paradise

Las Vegas, Henderson, and Summerlin solar and battery payback audit for NV Energy: understand NRS 704.773 75% net metering credits, optional TOU rates, and how to beat $4.20/W quotes.

Export Rule:75% Retail Net Metering Floor (20-Yr Lock)
Direct ESS Payback:4.7 yrs
Illinois · ILPeak: $0.165 – $0.21 / kWh

Chicago & Northern Illinois: Commonwealth Edison (ComEd)

Cities: Chicago, Naperville, Aurora, Joliet, Evanston, Schaumburg, Oak Lawn, Elgin, Waukegan

Chicago and Northern Illinois (ComEd) solar payback breakdown: claim your $8,500–$12,500 upfront Illinois Shines SREC check, ComEd's $300/kW + $300/kWh smart inverter/battery rebates, and winter math.

Export Rule:Upfront Illinois Shines SRECs ($9k–$12k Cash) + $300/kW Rebate
Direct ESS Payback:3.9 yrs
⚡ Direct Wholesale Hardware · Save $8,000–$14,000

Metro Utility Rate Arbitrage & Backup

Turnkey solar salespeople routinely charge $3.60–$4.80/W by bundling 30% loan dealer fees and $12,000+ battery margins. Buying Tier-1 UL9540 hardware directly—either DIY or hiring a local licensed electrician ($1,500–$2,500)—cuts total cost by 50–65%.

Compare All 5 Home Batteries (2026 Matrix) →Get a Free 2nd Opinion on Your Quote →
Best Pro/DIY Value vs. NEM 3.0 & MarkupsSignature Solar / EG4

EG4 18kPV Inverter + 14.3kWh PowerPro WallMount

DIRECT HARDWARE COST~$8,200 – $9,500 (Hardware)
EST. PAYBACK4.2 – 5.5 yrs

The gold-standard UL9540 all-in-one hybrid system. Pair an 18kW PV input hybrid inverter (200A pass-through) with an indoor/outdoor IP65 14.3kWh LiFePO4 WallMount battery—saving $12,000+ vs turnkey quotes.

  • 18kW PV Input / 12kW Continuous AC Output (200A Pass-Through)
  • 14.3kWh LiFePO4 (8,000+ cycles @ 80% DoD)
  • UL9540 & UL1741-SB Certified for Permit Approval
Best for: Whole-home 200A hybrid solar, NEM 3.0 TOU arbitrage & blackout defense
Check Price at Signature Solar →
Best Plug & Play Whole-Home BackupEcoFlow Official

EcoFlow Delta Pro Ultra (6kWh–30kWh Modular)

DIRECT HARDWARE COST~$4,999 – $5,799
EST. PAYBACK4.5 – 6.0 yrs

Skip the $30,000 contractor quote and 6-month utility interconnection wait. Delivers 7.2kW–21.6kW continuous 120V/240V split-phase output and 5.6kW Solar Input right out of the box—expandable up to 90kWh.

  • 7,200W–21,600W 120V/240V Split-Phase Output
  • 6.1kWh LFP Stackable Battery (scales to 30kWh–90kWh)
  • 5,600W Solar Input — Zero Roof Permit Required for Portable PV
Best for: Zero-contractor setup, peak-rate shaving, and instant blackout protection
Check Price at EcoFlow Official →
Best Budget Off-Grid & Hybrid KitRenogy Solar

Renogy 48V Off-Grid & Hybrid LFP Solar Kit

DIRECT HARDWARE COST~$3,200 – $4,800
EST. PAYBACK3.5 – 4.8 yrs

Complete modular 48V architecture combining high-efficiency N-type bifacial panels, a 48V 3,500W–5,000W MPPT inverter-charger, and smart modular LiFePO4 storage at ~$1.15/W hardware cost.

  • 48V High-Efficiency Bus (75% lower copper wire loss)
  • Modular 48V 50Ah / 100Ah Smart LiFePO4 Battery Bank
  • Complete Plug-and-Play MPPT All-in-One Controller
Best for: Cabins, workshops, garages, critical-load subpanels & budget DIYers
Explore Renogy 48V Kits →
Prefer a turnkey local installer without door-to-door sales reps? Compare online cash quotes from pre-vetted local contractors or use our Second-Opinion Quote Triage.
Compare Vetted Local Quotes (EnergySage) →

Auditor Disclosure: Solar Ledger never sells your contact information to solar telemarketers. Outbound partner links (/go/...) may earn a referral commission at zero additional cost to you.

Frequently Asked Questions: 2026 Metro Utility Solar Math

Which US metro area has the highest electricity rates and fastest solar battery payback in 2026?

San Diego (SDG&E) and the San Francisco Bay Area (PG&E) top the nation in 2026, with summer peak Time-of-Use rates reaching $0.62 to $0.82/kWh. Although California's NEM 3.0 cut daytime solar-only export credits by 75% to ~$0.04/kWh, pairing rooftop solar with a factory-direct 14.3kWh–15kWh LFP battery yields a 4.1 to 4.3-year simple payback by arbitraging a $0.55+/kWh daily rate spread.

Where does true 1:1 retail net metering still exist among major US metros in 2026?

Among major metro utilities in 2026, true 1:1 retail rate net metering remains available in New York City & Westchester (Con Edison with CBC fee), Long Island (PSEG Long Island), Miami / Tampa / South Florida (FPL Tier 1 under 10kW AC), and Chicago (ComEd 1:1 supply net metering plus Illinois Shines upfront SREC checks).

Why do deregulated Texas metros (Dallas Oncor and Houston CenterPoint) require a battery in 2026?

In Oncor (DFW) and CenterPoint (Houston) territories, Retail Electric Providers (REPs) routinely cap solar buyback credits at wholesale real-time prices ($0.03–$0.09/kWh) and do not credit the $0.052–$0.056/kWh TDU delivery pass-through fee on exported kWh. Storing midday solar in a home battery saves the full $0.18–$0.24/kWh delivered retail rate while providing hurricane and ERCOT grid-outage backup.

How much can homeowners save by buying a factory-direct battery (EG4 or EcoFlow) instead of a turnkey installer lease?

Across all 12 metro markets, door-to-door solar installers charge $14,000 to $19,500 per installed 13.5kWh battery and frequently tack on 28%–35% hidden loan dealer fees. Sourcing a UL 9540 certified EG4 PowerPro (14.3kWh + 18kPV hybrid inverter) or EcoFlow Delta Pro Ultra directly at wholesale pricing and hiring a local C-10/master electrician saves $8,500 to $14,000 upfront and cuts payback periods in half.