☀️SolarLedger
Nevada (NV) • NV Energy (Sierra Pacific Power & Nevada Power)Model: Time-Varying

NV Energy (Nevada) AB 405 Tier 4 (75% Net Metering) & Optional TOU Guide

Under Nevada AB 405 Tier 4, NV Energy credits monthly net excess exports at 75% of the retail rate—and calculates exports vs imports inside separate 15-minute / monthly buckets. Here is how Las Vegas and Reno homeowners keep 100% value.

Peak Import Rate
$0.15 – $0.17 / kWh (Flat) or $0.42 – $0.51 / kWh (Summer TOU Peak 6 PM – 9 PM)
Midday Export Credit
75% of Applicable Retail Rate (~$0.11 / kWh Flat or ~$0.075 TOU Off-Peak)
Peak Export / VPP Bonus
75% of Summer TOU Peak (~$0.36 / kWh exported between 6 PM – 9 PM!)
Min Monthly Bill
$18.50 Basic Service Charge (Southern NV) / $16.50 (Northern NV)

1. 24-Hour Import Cost vs. Export Credit Visualizer

Schedule: NV Energy Schedule NMR-405 Tier 4 (75% Excess Energy Credit)

Compare what NV Energy (Sierra Pacific Power & Nevada Power) charges you to import 1 kWh vs. what they pay you when you export 1 kWh during each time window—and how your battery inverter should be programmed:

8:00 AM – 6:00 PM (Mojave Desert Solar Window)
Import: 15.2¢/kWhExport: 11.4¢/kWh
Grid Buy:
Grid Sell:
Inverter Dispatch Rule: Self-consumption & battery charging saves 100% (15.2¢) instead of taking the 25% export penalty (11.4¢)
6:00 PM – 9:00 PM (Summer TOU On-Peak)
Import: 48¢/kWhExport: 36¢/kWh
Grid Buy:
Grid Sell:
Inverter Dispatch Rule: Run Las Vegas 5-ton A/C units 100% off LFP battery bank during 112°F evenings

2. Forensic Tariff & Battery Arbitrage Math

Battery Pairing Necessity Score: 83% Recommended (Captures 100% retail value vs 75% export haircut + NV Energy Battery Rebate)
  • 120-Year AB 405 Tier 4 Grandfathering: Nevada AB 405 locks in the 75% minimum excess energy credit floor for 20 years from the date your solar system receives Permission to Operate (PTO).
  • 2Monthly Netting Inside Each TOU Period: NV Energy nets kWh 1-for-1 within each monthly billing cycle (and within each TOU bucket if on TOU), and only applies the 25% haircut (75% credit) to the net excess exported at the end of the monthly billing cycle.
Optimal Hardware Architecture for NV Energy (Sierra Pacific Power & Nevada Power)

EG4 18kPV + 14.3kWh–28.6kWh LFP Battery (Desert High-Temp Rated)

Estimated Payback under NV Energy Schedule NMR-405 Tier 4 (75% Excess Energy Credit): 5.1 – 6.0 Years

View Direct Wholesale Pricing →

NV Energy (Sierra Pacific Power & Nevada Power) Solar Tariff FAQ

Should I choose NV Energy’s Flat Rate or Time-of-Use (TOU) rate with solar in Las Vegas?

If you have solar ONLY (no battery), stay on the Standard Flat Rate so midday exports net 1-for-1 against evening A/C within the month. If you have a large 28.6 kWh battery that can cover 100% of 6 PM–9 PM Summer Peak, TOU can unlock 36¢/kWh evening export credits.

Does NV Energy offer a battery storage incentive?

Yes, NV Energy’s Energy Storage Incentive program offers upfront rebates for residential batteries paired with Time-of-Use rates.

More Utility NEM 3.0 & Avoided Cost Rate Matrices