☀️SolarLedger
Georgia (GA) • Georgia Power (Southern Company)Model: Avoided Cost

Georgia Power RNR Instantaneous vs Monthly Netting Cap & Avoided Cost Guide

Because Georgia Power’s 5,000-customer Monthly Netting pilot cap filled up immediately, new Georgia solar homeowners are placed on Instantaneous Netting—where every kWh that touches the grid earns only ~6.8¢/kWh avoided cost while retail imports cost 16¢–29¢/kWh.

Peak Import Rate
$0.16 – $0.29 / kWh (Summer Tier 3 or Smart Usage Peak)
Midday Export Credit
$0.066 – $0.074 / kWh (Solar Avoided Cost Rate once 5,000-customer cap is full)
Peak Export / VPP Bonus
$0.074 / kWh (Instantaneous Export Credit)
Min Monthly Bill
$14.00 Base Charge (~$0.4603/day)

1. 24-Hour Import Cost vs. Export Credit Visualizer

Schedule: Schedule RNR-10 (Renewable & Non-Renewable Resources Tariff)

Compare what Georgia Power (Southern Company) charges you to import 1 kWh vs. what they pay you when you export 1 kWh during each time window—and how your battery inverter should be programmed:

9:00 AM – 2:00 PM (Solar Harvest Window)
Import: 15¢/kWhExport: 6.8¢/kWh
Grid Buy:
Grid Sell:
Inverter Dispatch Rule: Zero-export priority: power A/C and charge LFP battery to 100% SoC before 2:00 PM
2:00 PM – 7:00 PM (Georgia Power Summer On-Peak)
Import: 28¢/kWhExport: 6.8¢/kWh
Grid Buy:
Grid Sell:
Inverter Dispatch Rule: Run 100% off solar + battery to avoid 28¢/kWh On-Peak charges and Demand charges!
7:00 PM – 9:00 AM (Overnight)
Import: 13¢/kWhExport: 6.8¢/kWh
Grid Buy:
Grid Sell:
Inverter Dispatch Rule: Discharge battery to cover evening loads down to 20% storm reserve

2. Forensic Tariff & Battery Arbitrage Math

Battery Pairing Necessity Score: 94% Mandatory (Instantaneous netting credits exports at ~6.8¢ while Summer Peak imports cost up to 29¢)
  • 1What "Instantaneous Netting" Really Means on Your Georgia Power Meter: Your bidirectional smart meter does NOT net noon exports against 8 PM imports. The millisecond 1 kW of solar flows past your meter to the street, it is sold at ~6.8¢/kWh. One second later, if a cloud passes and you pull 1 kW from the street, you pay 16¢–29¢/kWh!
  • 2Demand Charge Shaving on Georgia Power "Smart Usage" Tariff: Many Georgia Power customers are placed on the Smart Usage TOU + kW Demand schedule ($12.20 per peak kW). An LFP hybrid inverter programmed in Peak Shaving mode caps grid kW draw at 0 kW from 2 PM to 7 PM—saving $80–$140/month in demand fees alone.
Optimal Hardware Architecture for Georgia Power (Southern Company)

EG4 18kPV Hybrid (Zero-Export / Peak-Shaving Mode) + 14.3kWh–28.6kWh LFP

Estimated Payback under Schedule RNR-10 (Renewable & Non-Renewable Resources Tariff): 5.5 – 6.4 Years

View Direct Wholesale Pricing →

Georgia Power (Southern Company) Solar Tariff FAQ

Is the Georgia Power 5,000-customer Monthly Netting program still open?

No, the 5,000-customer Monthly Netting cap ordered by the Georgia Public Service Commission reached capacity in 2021. All new RNR solar interconnections use instantaneous billing at the avoided-cost solar rate (~6.6¢–7.4¢/kWh).

How does a battery fix Georgia Power instantaneous netting?

With a hybrid inverter and 14.3 kWh+ LFP battery, your excess midday solar stays behind your meter inside your battery instead of exporting for 6.8¢, then powers your home all evening—valuing 100% of your solar at the full 16¢–29¢ retail rate.

More Utility NEM 3.0 & Avoided Cost Rate Matrices