☀️SolarLedger
Best Overall 200A Smart Load CenterUL 67 / UL 916 / UL 1741 PCSFull Panel Replacement

SPAN Smart Panel (Gen 2) Complete Engineering Teardown & Review

The SPAN Panel Gen 2 replaces your legacy 200A main or backup load center with 32 individually solid-state/hybrid relay-controlled circuits, native NEC 705.13 Power Control System (PCS) busbar clamping, and automatic State-of-Charge (SoC) load shedding that extends 13.5kWh home battery backup runtime by 40% to 65%.

Hardware Price
$3,500 – $3,800
Turnkey Installed
$5,200 – $7,500
Battery Runtime Extension
+40% to +65%
Busbar / Circuits
200A / 32 Ckts

Key Master Electrician & ROI Takeaways

  • ✓Replaces the messy 'critical loads subpanel' entirely—all 32 circuits remain backed up and dynamically prioritized via the SPAN Home App.
  • ✓Accepts standard 1-inch Eaton BR, Square D HOM, and Siemens QP thermal-magnetic circuit breakers while switching loads via internal 90A latching relays.
  • ✓Certified under UL 1741 PCS and NEC 705.13 to prevent 200A main busbar overload, eliminating $6,000–$15,000 utility 400A service upgrades when adding EVs and heat pumps.
  • ✓Direct local API/CAN/RS-485 integration with Tesla Powerwall 3, Enphase IQ8/5P, and FranklinWH to shed HVAC and water heaters automatically below 50% SoC.

Hardware & Busbar Specifications

Model & Platform
SPAN Panel MLO 32 (Gen 2 - 1-00200-xx)
Enclosure Rating
NEMA 3R (Indoor / Outdoor Rainproof)
Relay & Breaker Architecture
32 Internal 90A latching electromechanical relays ahead of standard plug-in thermal-magnetic breakers
CT Metering Accuracy
±0.5% revenue-grade per-circuit current sensing across all 32 branch spaces + 200A main lugs
Communications & Local API
Dual-band Wi-Fi, Ethernet (RJ45), Cellular LTE Backup, RS-485 / CAN bus
Dimensions, Weight & Warranty
39.6 x 14.3 x 6.0 in · 62 lbs · 10-Year Warranty

Single-Line Wiring & NEC Topology

Whole-Home Microgrid Load Center Behind MID / Gateway
Upstream Utility / MID Connection
Fed from Tesla Backup Gateway 2/3, Enphase IQ System Controller 3G, or FranklinWH aGate via 200A 240V split-phase Cu/Al conductors.
Solar & Battery Inverter Landing
Up to 90A backfed solar/storage breaker on designated corner lugs or upstream hybrid MID landing.
Neutral-Ground Bonding (NEC 250)
Configured as downstream subpanel when behind a Service Entrance (SE) rated MID; floating neutral bus with isolated ground bar.
Hardware Fail-Safe Behavior
Latching relays default to CLOSED (energized) state if logic board power fails, ensuring manual breaker operation always works.

3-Tier Dynamic Load Shedding & Battery Extension Matrix

Priority TierControl LogicTypical Connected LoadsTrigger ConditionBattery Runtime Impact
Must-Have (Tier 1)Keep On Until 0% SoCRefrigerator, freezer, well pump, sump pump, Wi-Fi router, medical CPAP, kitchen lightingRemains energized throughout entire outage until battery low-voltage cutoffBaseline 1.2 kW average draw (~11–18 hrs on 13.5kWh + solar recharge)
Nice-to-Have (Tier 2)Shed Below 50% Battery SoC3-Ton Heat Pump / AC compressor, induction range, microwave, home office circuitsAutomatically opens internal relay when battery SoC drops below 50% or during dark winter stormsSaves 14–22 kWh/day, extending backup duration by +42%
Non-Essential (Tier 3)Shed Immediately on Grid Loss48A EV Charger, electric clothes dryer, pool pump, hot tub heater, electric resistance water heaterTrips open within 100ms of utility grid loss; only re-energizes when excess solar >4kW & battery >85% SoCPrevents instantaneous 11.5kW inverter overload trip and saves 25+ kWh/day

2026 Hardware, Electrician Labor & Permit Cost Breakdown

Line ItemFair Cash Cost RangeAuditor Notes
SPAN Panel Gen 2 Hardware (32-Space)$3,500 – $3,800Includes main lugs, internal CTs, and LTE/Wi-Fi comms module
Licensed Electrician Main Panel Swap Labor (8–12 hrs)$1,500 – $2,800Labeling, extending branch circuit homerun wires, torqueing 32 circuits
New Branch Breakers & Arc-Fault/GFCI Upgrades$250 – $550Eaton BR / Siemens QP / Square D Homeline listed breakers
AHJ Electrical Permit & Utility Meter Pull Coordination$150 – $400Eligible for 30% IRA Section 25C ($600 cap) or 30% Section 25D when bundled with battery

Engineering Pros

  • +Universal breaker compatibility (Eaton BR, Square D Homeline, Siemens QP) lowers replacement breaker cost
  • +Eliminates the 12-circuit critical loads subpanel during battery installations
  • +Dynamic Power Control System (PCS) prevents 200A main breaker trips when running EV + heat pump + induction stove
  • +Best-in-class consumer mobile app with real-time per-circuit watt graphs and solar self-consumption routing

Limitations & Watchouts

  • −High upfront hardware cost ($3,500+) compared to a standard $250 copper busbar load center
  • −Internal relays are NOT overcurrent protection devices—still requires physical thermal-magnetic breakers
  • −Requires certified SPAN installer commissioning via the SPAN Installer App

Frequently Asked Questions

Does the SPAN Panel qualify for the 30% federal solar tax credit?

Yes. When installed in conjunction with a solar + battery storage system (IRC Section 25D) or as an enabling electrical panel upgrade under IRC Section 25C (up to $600 standalone credit, or 30% uncapped when part of a qualified battery storage installation), homeowners can significantly reduce net out-of-pocket costs.

What happens if SPAN's cloud servers go down or Wi-Fi fails during a blackout?

All load-shedding rules, battery SoC communications (via local LAN/RS-485/CAN), and NEC 705.13 busbar current limits execute locally on the SPAN Gateway processor inside the panel. Furthermore, the latching relays fail-safe in the closed position so physical breakers operate normally.

Did an Installer Quote You $8,000+ for a Panel Upgrade or Smart Load Center?

Run your quote through the SolarLedger Quote Auditor or check your exact NEC 220 load calculation in 60 seconds.