☀️SolarLedger
ADT Solar Exited Industry (2024) | Vision Solar Chapter 7 Liquidation

ADT Solar (Sunpro) & Vision Solar Shutdown Survival Guide: Warranties, PTO & Loan Disputes

How homeowners affected by ADT Solar’s 2024 nationwide closure (formerly Sunpro Solar) and Vision Solar’s Chapter 7 bankruptcy can unlock Enphase Enlighten monitoring, enforce remaining ADT corporate obligations, or finish abandoned utility interconnection permits.

Affected Entity
ADT Solar (formerly Sunpro Solar) & Vision Solar LLC (Chapter 7)
Primary Survival Path
Enphase Enlighten Self-Transfer + ADT Corporate Legacy Ticket or FTC Holder Rule Claim
Affected States
FL, TX, LA, PA, NJ, MA, AZ, NC, SC, GA, MS, VA, IL

1. Step-by-Step Homeowner Emergency Rescue Protocol

ACTION 1

Step 1 — Distinguish Between ADT Solar (Sunpro) vs. Vision Solar Legal Status: Unlike Vision Solar (which liquidated in Chapter 7 bankruptcy with zero assets), ADT Inc. (NYSE: ADT) is an active multi-billion-dollar corporation that shut down its residential solar division in 2024. This means ADT Inc. still exists legally and maintains a legacy solar customer service queue (800-581-6776) for active workmanship claims!

ACTION 2

Step 2 — Claim Your Enphase Microinverter & LG/Silfab Panel Warranties: Almost 100% of ADT Solar / Sunpro Solar installations used Enphase microinverters and Qcells, Silfab, or LG Solar panels. Even though LG exited panel manufacturing in 2022, LG Electronics USA Inc. fully honors its 25-year panel and labor reimbursement warranty at lg.com/us/solar.

ACTION 3

Step 3 — Rescue Abandoned Vision Solar Permits in PA, NJ, FL, MA & AZ: Vision Solar notoriously left thousands of roofs with panels installed but failed electrical inspections and unfiled utility interconnection packets. Pull your permit history from your township building office, hire a local licensed solar electrician to correct NEC code violations (often grounding or conduit strapping), and file your utility PTO directly.

ACTION 4

Step 4 — Stop Unfinished Vision Solar Loan Billing Under the FTC Holder Rule: If Vision Solar collected loan disbursements from Mosaic, GoodLeap, or Dividend Finance without ever achieving Utility Permission to Operate (PTO), send a formal Certified Mail notice demanding loan cancellation and refund of payments made for a non-operational system.

2. Direct OEM Warranty Desks & State Restitution Hotlines

Bypass defunct installer phone numbers and contact the underlying equipment manufacturers and state recovery agencies directly:

Manufacturer / AgencyDirect Hotline / EmailRequired Homeowner ActionPortal
ADT Solar / Sunpro Legacy Customer Support Desk(800) 581-6776Open a legacy workmanship or roof-leak ticket directly with ADT Corporate (keep written ticket numbers).Open Portal ↗
Enphase Energy (IQ7/IQ8 Microinverter & IQ Battery Support)(877) 797-4743Verify Enphase Enlighten account access and submit direct RMAs for any non-reporting microinverters.Open Portal ↗
LG Electronics USA Solar Warranty Desk (For Sunpro LG Panels)(888) 865-3026Submit LG NeON 2 / NeON R serial numbers for 25-year panel replacement or prorated cash payout + $450 labor allowance.Open Portal ↗

3. Orphaned System RMA & Legal Decision Flowchart

View All 12 Factory RMA Playbooks →
ADT SOLAR (SUNPRO) & VISION SOLAR RESCUE TREE
================================================================================
[Identify Your Original Installer]
       │
       ├──► 1. ADT SOLAR / SUNPRO SOLAR
       │       ├──► Roof Leak or Workmanship Issue? -> Call ADT Legacy (800-581-6776)
       │       ├──► Microinverter Out? -> Enphase App Self-RMA (25-Yr Coverage)
       │       └──► LG Panel Degraded? -> LG USA Solar Warranty Cash/Swap Claim
       │
       └──► 2. VISION SOLAR (Chapter 7 Liquidation)
               ├──► System Never Turned On (No PTO)? -> File FTC Holder Rule Loan Cancellation
               └──► Need Inspection Sign-Off? -> Hire Local Electrician as Contractor of Record

Frequently Asked Questions: ADT Solar (formerly Sunpro Solar) & Vision Solar LLC (Chapter 7)

Since ADT Inc. is still in business, do they have to honor my 25-year Sunpro/ADT Solar workmanship warranty?

Yes! Because ADT Inc. closed its solar division voluntarily rather than filing Chapter 7 bankruptcy, the parent entity remains legally bound by the written workmanship and roof-penetration warranty in your contract. If ADT delays sending a sub-contractor for more than 30 days, file a complaint with your State Contractors Board and State Attorney General.

What happens if I have LG Solar panels installed by Sunpro and one panel cracks or fails?

LG Electronics USA still honors the full 25-year product, performance, and labor warranty on all LG NeON panels. When a panel is verified defective, LG either ships a replacement module from its warranty reserve or issues a direct cash reimbursement equal to the panel’s current market value plus up to $450 in labor.

How do I remove a Vision Solar UCC-1 lien from my home title if the system was never finished?

Send a written demand under UCC § 9-513 to the financing company (listed as the Secured Party on the county UCC-1 fixture filing) demanding a UCC-3 Termination Statement within 20 days on grounds of failure of consideration and installer abandonment.

More Orphaned Solar & Bankruptcy Survival Guides