☀️SolarLedger

2026 California Solar ROI & Electric Rate Breakdown by County (38 Counties)

CPUC NEM 3.0 Net Billing Tariff (~$0.04–$0.05/kWh midday export; home battery storage mandatory for 4–5 yr payback). California SB 379 Mandatory Instant Online Solar Permitting (SolarApp+ / Symbium) & Title 24 UL 9540 ESS compliance; 100% California Property Tax Exclusion on active solar + battery systems through 2026.

🛡️ Audit a California Solar Quote →📊 California Statewide Calculator →
CountyPrimary Electric UtilityAvg Rate ($/kWh)Peak Sun HoursEst. Yr-1 SavingsCash PaybackCounty Teardown
Los Angeles CountySouthern California Edison (SCE) / LADWP$0.52/kWh5.8 hrs/day$8,102/yr3.8 yrsView Math →
San Diego CountySan Diego Gas & Electric (SDG&E)$0.68/kWh5.9 hrs/day$10,778/yr3.8 yrsView Math →
Orange CountySouthern California Edison (SCE) / SDG&E$0.54/kWh5.8 hrs/day$8,414/yr3.8 yrsView Math →
Riverside CountySouthern California Edison (SCE) / IID$0.50/kWh6.2 hrs/day$8,328/yr3.8 yrsView Math →
San Bernardino CountySouthern California Edison (SCE)$0.51/kWh6.3 hrs/day$8,631/yr3.8 yrsView Math →
Santa Clara CountyPacific Gas & Electric (PG&E) / Silicon Valley Power$0.56/kWh5.6 hrs/day$8,425/yr3.8 yrsView Math →
Alameda CountyPacific Gas & Electric (PG&E) / Ava Community Energy$0.58/kWh5.5 hrs/day$8,570/yr3.8 yrsView Math →
Sacramento CountySMUD (Sacramento Municipal Utility District)$0.24/kWh5.7 hrs/day$3,675/yr7.8 yrsView Math →
Contra Costa CountyPacific Gas & Electric (PG&E) / MCE$0.58/kWh5.6 hrs/day$8,725/yr3.8 yrsView Math →
Fresno CountyPacific Gas & Electric (PG&E)$0.57/kWh6 hrs/day$9,187/yr3.8 yrsView Math →
Kern CountyPacific Gas & Electric (PG&E) / SCE$0.55/kWh6.1 hrs/day$9,013/yr3.8 yrsView Math →
San Francisco CountyPacific Gas & Electric (PG&E) / CleanPowerSF$0.59/kWh5.2 hrs/day$8,242/yr3.8 yrsView Math →
Ventura CountySouthern California Edison (SCE) / CPA$0.53/kWh5.8 hrs/day$8,258/yr3.8 yrsView Math →
San Mateo CountyPacific Gas & Electric (PG&E) / Peninsula Clean Energy$0.58/kWh5.4 hrs/day$8,414/yr3.8 yrsView Math →
San Joaquin CountyPacific Gas & Electric (PG&E)$0.55/kWh5.8 hrs/day$8,570/yr3.8 yrsView Math →
Stanislaus CountyMODESTO Irrigation District / Turlock ID / PG&E$0.36/kWh5.8 hrs/day$5,609/yr5.1 yrsView Math →
Sonoma CountyPacific Gas & Electric (PG&E) / Sonoma Clean Power$0.57/kWh5.4 hrs/day$8,269/yr3.8 yrsView Math →
Tulare CountySouthern California Edison (SCE) / PG&E$0.52/kWh6 hrs/day$8,382/yr3.8 yrsView Math →
Solano CountyPacific Gas & Electric (PG&E)$0.56/kWh5.6 hrs/day$8,425/yr3.8 yrsView Math →
Santa Barbara CountySouthern California Edison (SCE) / PG&E$0.53/kWh5.8 hrs/day$8,258/yr3.8 yrsView Math →
Monterey CountyPacific Gas & Electric (PG&E) / 3CE$0.56/kWh5.5 hrs/day$8,274/yr3.8 yrsView Math →
Placer CountyPacific Gas & Electric (PG&E) / Roseville Electric$0.48/kWh5.7 hrs/day$7,350/yr3.9 yrsView Math →
San Luis Obispo CountyPacific Gas & Electric (PG&E) / 3CE$0.56/kWh5.8 hrs/day$8,725/yr3.8 yrsView Math →
Santa Cruz CountyPacific Gas & Electric (PG&E) / 3CE$0.57/kWh5.4 hrs/day$8,269/yr3.8 yrsView Math →
Merced CountyPacific Gas & Electric (PG&E) / Merced ID$0.51/kWh5.9 hrs/day$8,083/yr3.8 yrsView Math →
Marin CountyPacific Gas & Electric (PG&E) / MCE$0.59/kWh5.4 hrs/day$8,559/yr3.8 yrsView Math →
Butte CountyPacific Gas & Electric (PG&E)$0.56/kWh5.7 hrs/day$8,575/yr3.8 yrsView Math →
Yolo CountyPacific Gas & Electric (PG&E) / Valley Clean Energy$0.55/kWh5.7 hrs/day$8,422/yr3.8 yrsView Math →
El Dorado CountyPacific Gas & Electric (PG&E)$0.56/kWh5.7 hrs/day$8,575/yr3.8 yrsView Math →
Imperial CountyImperial Irrigation District (IID)$0.22/kWh6.5 hrs/day$3,842/yr7.4 yrsView Math →
Shasta CountyPacific Gas & Electric (PG&E) / Redding Electric$0.45/kWh5.6 hrs/day$6,770/yr4.2 yrsView Math →
Madera CountyPacific Gas & Electric (PG&E)$0.56/kWh6 hrs/day$9,026/yr3.8 yrsView Math →
Kings CountyPacific Gas & Electric (PG&E) / SCE$0.54/kWh6 hrs/day$8,704/yr3.8 yrsView Math →
Napa CountyPacific Gas & Electric (PG&E) / MCE$0.58/kWh5.6 hrs/day$8,725/yr3.8 yrsView Math →
Humboldt CountyPacific Gas & Electric (PG&E) / RCEA$0.55/kWh4.6 hrs/day$6,797/yr4.2 yrsView Math →
Nevada CountyPacific Gas & Electric (PG&E) / Truckee Donner PUD$0.45/kWh5.6 hrs/day$7,358/yr4.1 yrsView Math →
Mendocino CountyPacific Gas & Electric (PG&E) / Sonoma Clean Power / City of Ukiah$0.44/kWh5.4 hrs/day$6,937/yr4.2 yrsView Math →
Sutter CountyPacific Gas & Electric (PG&E) / Pioneer Community Energy$0.42/kWh5.7 hrs/day$6,990/yr4.1 yrsView Math →
⚡ Direct Wholesale Hardware · Save $8,000–$14,000

Recommended Home Battery & Hybrid Inverter Kits for California

Turnkey solar salespeople routinely charge $3.60–$4.80/W by bundling 30% loan dealer fees and $12,000+ battery margins. Buying Tier-1 UL9540 hardware directly—either DIY or hiring a local licensed electrician ($1,500–$2,500)—cuts total cost by 50–65%.

Compare All 5 Home Batteries (2026 Matrix) →Get a Free 2nd Opinion on Your Quote →
Best Pro/DIY Value vs. NEM 3.0 & MarkupsSignature Solar / EG4

EG4 18kPV Inverter + 14.3kWh PowerPro WallMount

DIRECT HARDWARE COST~$8,200 – $9,500 (Hardware)
EST. PAYBACK4.2 – 5.5 yrs

The gold-standard UL9540 all-in-one hybrid system. Pair an 18kW PV input hybrid inverter (200A pass-through) with an indoor/outdoor IP65 14.3kWh LiFePO4 WallMount battery—saving $12,000+ vs turnkey quotes.

  • 18kW PV Input / 12kW Continuous AC Output (200A Pass-Through)
  • 14.3kWh LiFePO4 (8,000+ cycles @ 80% DoD)
  • UL9540 & UL1741-SB Certified for Permit Approval
Best for: Whole-home 200A hybrid solar, NEM 3.0 TOU arbitrage & blackout defense
Check Price at Signature Solar →
Best Plug & Play Whole-Home BackupEcoFlow Official

EcoFlow Delta Pro Ultra (6kWh–30kWh Modular)

DIRECT HARDWARE COST~$4,999 – $5,799
EST. PAYBACK4.5 – 6.0 yrs

Skip the $30,000 contractor quote and 6-month utility interconnection wait. Delivers 7.2kW–21.6kW continuous 120V/240V split-phase output and 5.6kW Solar Input right out of the box—expandable up to 90kWh.

  • 7,200W–21,600W 120V/240V Split-Phase Output
  • 6.1kWh LFP Stackable Battery (scales to 30kWh–90kWh)
  • 5,600W Solar Input — Zero Roof Permit Required for Portable PV
Best for: Zero-contractor setup, peak-rate shaving, and instant blackout protection
Check Price at EcoFlow Official →
Best Budget Off-Grid & Hybrid KitRenogy Solar

Renogy 48V Off-Grid & Hybrid LFP Solar Kit

DIRECT HARDWARE COST~$3,200 – $4,800
EST. PAYBACK3.5 – 4.8 yrs

Complete modular 48V architecture combining high-efficiency N-type bifacial panels, a 48V 3,500W–5,000W MPPT inverter-charger, and smart modular LiFePO4 storage at ~$1.15/W hardware cost.

  • 48V High-Efficiency Bus (75% lower copper wire loss)
  • Modular 48V 50Ah / 100Ah Smart LiFePO4 Battery Bank
  • Complete Plug-and-Play MPPT All-in-One Controller
Best for: Cabins, workshops, garages, critical-load subpanels & budget DIYers
Explore Renogy 48V Kits →
Prefer a turnkey local installer without door-to-door sales reps? Compare online cash quotes from pre-vetted local contractors or use our Second-Opinion Quote Triage.
Compare Vetted Local Quotes (EnergySage) →

Auditor Disclosure: Solar Ledger never sells your contact information to solar telemarketers. Outbound partner links (/go/...) may earn a referral commission at zero additional cost to you.